Project: Preliminary plan photovoltaic system
Role: Engineer G. Racioppi, designer, as employee of the ACM-e srl (Italy)
Year: 2009
Description: Preliminary electrical design for the request of national electric network connection to ENEL, 500kWp photovoltaic plant in Basilicata (norms CEI 0-16 and CEI 82-25).